Refine your search with the filters below

Newsletter 3 Eyre Peninsula Reinforcement Project

Learn more about how our Eyre Peninsula Reinforcement Project is progressing in the third project newsletter.

Network Capability Incentive Parameter Action Plan

Find out more about ElectraNet's proposal to incentivise Transmission Network Service Providers to identify low cost network improvements that would p...

Consultation Summary for Network Capability Action Plan

Read a summary of outcomes from our consultation on ElectraNet's projects that help to improve network capability.

Network Vision Discussion Paper

Read more about ElectraNet's vision for the network in our Network Vision Discussion Paper.

Pricing Methodology

Read more about the pricing methodology for providing prescribed transmission services in South Australia.

Letter from SACOSS Network Capability Action Plan

Read SACOSS' submission to our consultation on our Network Capability Action Plan.

Letter from MEU Network Capability Action Plan

Read the MEU's submission to ElectraNet's consultation on our Network Capability Action Plan.

Initial Revenue Proposal Outlook

Read an overview of the emerging directions for ElectraNet’s revenue proposal for the 1 July 2018 to 30 June 2023 regulatory period.

Renewable Energy Integration in South Australia

Read about ElectraNet's joint study with AEMO on securing South Australia's power system operation with high levels of wind and PV generation.

Letter from Generators Baroota Substation Upgrade Project PSCR

Read the response from the Generators to the RIT-T Project Specification Consultation Report (PSCR) for our Baroota Substation Upgrade Project.

Project Specification Consultation Report Baroota Substation Upgrade Project

Read ElectraNet's and SA Power Network's RIT-T Project Specification Consultation Report (PSCR) on the Baroota Substation Upgrade Project to find out ...

Transmission Service Price Schedule to 30 June 2016

Find out more about our previous prescribed transmission network and exit prices for connection points providing prescribed services.

Project Assessment Conclusions Report Dalrymple Substation

Read ElectraNet's RIT-T Project Assessment Conclusions Report (PACR) for our Dalrymple Substation Upgrade Project to find out about the preferred opt...

South Australian Planning System Review Issues Paper

Find out about how ElectraNet is assisting in the South Australian Planning System Review.

Project Specification Consultation Report Dalrymple Substation

Read ElectraNet's Project Specification Consultation Report (PSCR) on the technical and economic viability of an upgrade to the Dalrymple substation.

Letter from National Generators Forum Eyre Peninsula Reinforcement Project PADR

Read the response from the National Generators Forum to the RIT-T Project Assessment Draft Report (PADR) on our Eyre Peninsula Reinforcement Project.

Project Assessment Conclusions Report Appendix Heywood Interconnector

Read about the NPV for the different options identified to increase the transfer capability of the Heywood Interconnector from ElectraNet's and AEMO's...