
Northern Transmission Project (NTx)

Managing the Risk of 275 kV Current Transformer Failures 2024-2028

Managing the Risk of Hummock to Ardrossan West 132 kV Line Failure

Managing the Risk of Transformer Bushing Failures 2024-2028

Managing the Risk of Isolator Failure 2024-2028

Managing the Risk of Circuit Breaker Failures 2024-2028

Managing the Risk of Protection Relay Failure 2024-2028

Managing the Risk of Line Insulation System Failure 2024-2028

Managing the Risk of Instrument Transformer Failure 2024 – 2028

Eyre Peninsula Upgrade

Annual Aerial Inspections
