Project Overview
This development will replace the entire secondary systems at Para substation and other primary plant identified as requiring replacement, in line with the service standards outlined in the South Australian Electricity Transmission Code.
This development will replace the entire secondary system and minor primary plant at Para substation. This includes replacement of 132 kV capacitor voltage transformers, 132 kV and 66 kV surge arresters, protection schemes, control systems and other equipment with new systems that are in accordance with the current ElectraNet design standard.
Detailed design and construction is currently being undertaken.
Planned Energisation: March 2016