Project Overview

This project has been superseded by the Eyre Peninsula Electricity Supply Options project.

Working together on the Eyre Peninsula factsheet (PDF, 2.6MB)
Eyre Peninsula Reinforcement Project Newsletter 1 (PDF, 2MB)
Eyre Peninsula Reinforcement Project Newsletter 2 (PDF, 690KB)
Eyre Peninsula Reinforcement Project Newsletter 3 (PDF, 1MB)
 
 

Project Specification Consultation Report

Consultation closed on 18 May 2012

 

Community Information Session

Project Information Stand at the 2012 Eyre Peninsula Field Days, 7-9 August 2012

 

Planning Study

Planning Study to identify a route for a future transmission line upgrade commenced during October 2012. Included environmental, cultural heritage, land-use and engineering evaluations. Landowners and the wider Eyre Peninsula community provided extensive input.

 

Project Assessment Draft Report

Consultation closed on 1 March 2013

 

Community Information Sessions

21 March 2013 – Community Drop-In Day at Cleve District Hall, 12-7pm
22 March 2013 – Community Drop-In Day at Ungarra & Districts Community Sports Club, 12-7pm
23 March 2013 – Community Drop-In Day at Port Lincoln Golf Club, 10am-5pm

 

Community Information Session

Project Information Stand at the 2014 Eyre Peninsula Field Days, 12-14 August 2014

 

Planning Study

A preferred alignment for the future transmission line upgrade for the northern section between Cultana and Yadnarie was identified

 

Planning Study

A preferred alignment for the future transmission line upgrade for the southern section between Yadnarie and Ungarra was identified

 

Planning Study

Further work to identify a preferred alignment for the future transmission line upgrade for the southern section between Ungarra and Port Lincoln is underway